GRAITEC UK - Home
    • Press Releases
    • GRAITEC Group
    • Vacancies
    • Contact Us
    • Advance Steel
    • Advance Concrete
    • Advance Design
    • SuperSTRESS
    • Downloads
    • Maintenance
    • Demos
    • FAQ's
    • Desktop Sharing
    • Training
    • Consultancy
    • Programming
    • Advance Steel
    • Advance Concrete
    • Advance Design
    • SuperSTRESS
Newsletter Contact Events Graitec Advantage Login





International References

Advance Concrete References

Advance Design References

SuperSTRESS References

Customer Quotes




"Everything about the software is fantastic! The learning curve is small and the transition from AutoCAD to Advance Steel was very easy."
 
Danny Silva-Netto, Metalfab Engineering


Contact Us
Tel: +44 (0)1932 858516
Email: mail@graitec.co.uk

References

Customer projects undertaken using Advance Steel 

The following are a number of projects undertaken with our Advance Steel software. These projects demonstrate a wide range of constructive challenges but all have incredibly complex geometrical problems which Advance Steel has had to solve.

 

Garmisch-Partenkirchen Olympic Ski Jump 

Garmisch-Partenkirchen Olympic Ski JumpConstructed by Bitschnau GmbH the Olympic ski jump - nicknamed the 'Olympic Cantelever' - was officially opened in December 2008 and will host the International Four Hills Tournament in January 2009. This renown competition has been hosted in the town for the last 55 years.  

The spectacular design of the jump has gained international recognition and has been nominated for the Mies van der Rohe Award 2009.

Download PDF Case Study

 

Zlote Tarasy Golden Terraces 

Zlote Tarasy Golden TerracesThe architecturally elaborate, aesthetically beautiful Zlote Tarasy Golden Terraces shopping centre in Warsaw, Poland was constructed by the industry specialists Waagner-Biro Stahl-Glas-Technik.  

Download PDF Case Study

 

 

 

The New Milan Fair  

The New Milan FairThe contemporary vela roof of the New Milan Fair has an increadibly complex design reminiscent of the Alps. The speed at which the 1.3 kilometre long free form roof was modelled was achieved using Advance Steel and its automatic drawing creation.

Download PDF Case Study

 

 

Bermuda Weather Radar Tower

Bermuda Weather Radar TowerDesigned to help with the prediction of Bermudas' unpredictable weather changes the Radar Tower had to be designed to withstand hurricane velocity winds. 

Download PDF Case Study

 

 

 

 

The Neiderwartha Bridge

The Neiderwartha BridgeThe Niederwartha bridge - completed in 2008 - which spans the River Elba between Niederwartha and Meissen is the longest cable stayed bridge in Germany and consists of 1232 tonnes of steel. 

Download PDF Case Study

 

 

 

3V-3 Booster Heater

3V-3 Booster HeaterThe 3V-3 Booster Heater designed by Heurtey Petrechem Romania is the latest generation in tubular process fired heaters.

Download PDF Case Study 

 

 

 

 

 

 

   

 

The Zeotermeer UFO

The Zeotermeer UFOA UFO shaped building in the centre of Zeotermeer Advance Steel was specifically chosen for this project due to its versitility; almost all the beams of this 290 tonne project are curved and so a key required for software was that it was able to handle the complex geometry involved.

Download PDF Case Study

 

 

Audi N-24 Production Hall

Audi N-24 Production HallAudi's new production hall located in Inglostadt, Germany covers a huge area of 5750 square metres. The job was so vast that they required software that could work with an unlimited amount of parts. 

Download PDF Case Study

 

 

Norwich Theatre Royal Modernisation

Norwich Theatre Royal ModernisationThe £10million modernisation of the Theatre Royal, Norwich was reopened in November 2007 and has transformed the Theatre with 7 tonnes of new steel work creating a new Royal Circle.  

Download PDF Case Study 

  

 

Duisburg Casino Canopy 

Duisburg Casino CanopyCreating a funnel effect to draw visitors in, the Duisburg casino canopy weighs 50 tonnes and is suspended 10 metres in the air. 

Download PDF Case Study 

 

 

Warehouse for the containment of explosive products 

Warehouse for the containment of explosive productsA steel arc, with a span of 72 metres but built of straight beams, this structure was completely modelled in 3 weeks due to Advance Steel.  

Download PDF Case Study

 

 

®1986-2009 GRAITEC
Graitec Group | sitemap | contact